Complete GLT Manufacturing Facility

Complete GLT Manufacturing Facility for Koles d.o.o. in Slovenia

Company Koles d.o.o. in Slovenia has invested in a new Turnkey industrial production for glue laminated timber. The line recently went into production stage and will shortly start to supply the domestic as well as European market with glulam beams. Ledinek got the opportunity to supply a complete GLT line.

Company: Koles d.o.o.
Location: Kočevje / Slovenia
Species: spruce, fir, pine
Production capacity: 17.900 m³/y - glulam beams in 2 shifts operation

Turnkey GLT production

1. Tilt hoist de-stacker
2. Moisture meter, reject gate
3. EUROPLAN 300-4V S40
4. Defect marking station
5. Two-level feeding to defect cutting saw
6. Defect cutting saw X-CUT
7. Pull off with lug chains and alignment roll conveyor
8. Infeed to finger jointing machine
9. EUROZINK Compact 6-400 kN finger jointing machine up to 6 pcs/min
10. Floor storage divided in two parts
11. Infeed conveyor to planer with tact roll
12. EUROPLAN 300-4V S80
13. AkzoNobel glue applicator
14. GIGAPRESS vertical press for cold gluing of laminated beams
15. Cross chain conveyor with singling device
16. Liftable roll conveyor for feeding to final planer
17. EUROPLAN 600-4V+4F S40 beam planer 4 side + 4 chamfering units 600 × 300 mm

Facts

  • up to 17.900 m³/year or 35 m³/shift for glulam beams
  • MUF glue with cold setting
  • High flexibility of production


Video

TEST

Print page to PDF